The Centre for structures and prestressing-References-Laboratory

The Centre for structures and prestressing - References

Laboratory for testing of structures

Load test tests were carried out for an extremely large number of bridge constructions, of which we mention: the Gazela bridge over the Sava river in Belgrade, after reconstruction, bridges within the northern access road of the bridge near Ada in Belgrade, the bridge over the Danube river near Beška, after reconstruction, bridges on the E-80 highway, bridges on the E-75 highway, the bridge over the Danube river on the IB state road no. 14, section: Smederevo – Kovin, bridges within the railway line E-85, section: Stara Pazova – Novi Sad, 2021.

Testing of rock anchors with a test load was performed for various structures, such as the Laz and Munjino brdo tunnels as part of the construction of the E-763 highway.

The activities of the Laboratory for testing of structures include:

  • Research work and testing of model of roof structure on object in Lybia
  • Research work and testing of model of roof structure on Museum of revolution
  • Research work and testing on a model of nuclear reactor
  • Numerous researches and testing on all kinds of constructions, bridges, buildings etc.

The activities also include monitoring and scientific research.