| 1 | Final concrete quality assessment reports for structures constructed in Serbia for Širbegović Group – GMT Konstrukcije, Gračanica, Bosnia and Herzegovina | Širbegović Inženjering, Gračanica, Bosnia and Herzegovina |
| 2 | Ongoing concrete quality control at the construction site: E-763 motorway section from Preljina to Požega, including bridge and roadway construction works, for China Communications Construction Company LTD, Belgrade Branch, Savski Venac | Ministry of Construction, Transport and Infrastructure; Public Enterprise Roads of Serbia |
| 3 | Ongoing concrete quality control at the construction site: E-763 motorway section from Preljina to Požega, including construction of the Munjino Brdo and Laz tunnels, with a total length exceeding 6 km, for China Communications Construction Company LTD, Belgrade Branch, Savski Venac | Ministry of Construction, Transport and Infrastructure; Public Enterprise Roads of Serbia |
| 4 | Ongoing concrete quality control at the construction site: expressway section from Iverak to Lajkovac, for China Shandong International Economic & Technical Cooperation Group Ltd., Belgrade Branch | Ministry of Construction, Transport and Infrastructure; Public Enterprise Roads of Serbia |
| 5 | LOT B3.2 – Construction of the Ostružnica Bridge within a consortium with UTIBER from Hungary | Public Enterprise Roads of Serbia |
| 6 | Final concrete quality assessment reports for structures constructed in Serbia for Baupartner | Baupartner, Lukavac, Bosnia and Herzegovina |
| 7 | Independent laboratory quality control of concrete during construction works on the E-75 motorway, LOT 1 – Road and bridge construction from Grdelica to Predejane Tunnel, for Integral Inženjering, Niš | Ministry of Construction, Transport and Infrastructure; Public Enterprise Corridors of Serbia d.o.o. |
| 8 | Quality control during construction works on the Arilje Dam and Reservoir project – Svračkovo profile, for Hidrotehnika – Hidroenergetika, Belgrade | Public Enterprise Corridors of Serbia d.o.o. |
| 9 | Professional supervision for design review and construction works control during the construction of the motorway from Kuzmin to Sremska Rača, with a total length of 17 km | Ministry of Construction, Transport and Infrastructure; Public Enterprise Roads of Serbia |
| 10 | Ongoing concrete quality control at the construction site: Bridge over the Sava River near Šabac on the Ruma – Šabac – Loznica road, with a length of 2 km | Ministry of Construction, Transport and Infrastructure; Public Enterprise Corridors of Serbia |
| 11 | Ongoing concrete quality control at the construction site: Construction of the E-763 motorway section from Surčin to Novi Beograd for China Communications Construction Company LTD, Belgrade Branch, Savski Venac | Ministry of Construction, Transport and Infrastructure; Public Enterprise Roads of Serbia |
| 12 | Ongoing concrete quality control at the construction site: Reconstruction and expansion of Nikola Tesla Airport Belgrade for the Vinci–Terna consortium | Vinci Airports |
| 13 | Ongoing concrete quality control at the construction site: Construction of the Simfonia and Metropoliten residential and commercial complexes for Roberts Millennium d.o.o. Belgrade | Belgrade Waterfront d.o.o. |