| No. | Reference | Investor |
|---|---|---|
| 1 | Load testing of railway bridges, section: Stara Pazova – Novi Sad (40 bridges) | RŽD International Infrastruktura Železnice Srbije a.d. |
| 2 | Load capacity testing of rock anchors – Laz and Munjino Brdo tunnels, E-763 Motorway construction, section: Preljina – Požega | China Communications Construction Company Ltd. |
| 3 | Load capacity testing of rock anchors – Iriški Venac tunnel, Construction of State Road IB Class No. 21, Novi Sad – Ruma | China Road & Bridge Corporation Serbia, Belgrade Branch |
| 4 | Investigation services on supporting steel and concrete structures of the main power building (GPO) – Boiler supporting steel structure at Block A1 | PE Electric Power Industry of Serbia Belgrade, TENT Branch Belgrade – Obrenovac |
| 5 | Investigation services on supporting steel and concrete structures of the main power building (GPO) – Boiler supporting steel structure at Block A2 | PE Electric Power Industry of Serbia Belgrade, TENT Branch Belgrade – Obrenovac |
2021.
| No. | Reference | Investor |
|---|---|---|
| 1 | Engineering services for drilling, installation, grouting, post-tensioning, and load capacity testing of geotechnical anchors for slope stabilization on the E-75 motorway, section: Gornje Polje – Predejane Tunnel, LOT 1, Cut 2, Cut 4 | Integral Inženjering, Niš Branch |
| 2 | Application of SPB and SPB SUPER post-tensioning systems and post-tensioning works for the bridge over the Klisura River, under the heavy maintenance project for State Road IB-35, section: Zaječar – Knjaževac | Integral Inženjering, Niš Branch / Fortis Niskogradnja d.o.o. Belgrade |
| 3 | Application of SPB and SPB SUPER post-tensioning systems and post-tensioning works for the rehabilitation of the bridge over the Tisa River near Titel | MOST-NS d.o.o. Novi Sad / RINCOP d.o.o. Veternik |
| 4 | Application of SPB and SPB SUPER post-tensioning systems and beam post-tensioning works for the structural rehabilitation of hangar frame structures at Batajnica Airport | Dijamant Inženjering d.o.o. Belgrade |
| 5 | Application of the BBR post-tensioning system and post-tensioning works on the overpass at km 26+392 of the Belgrade – Subotica railway, section: Belgrade – Stara Pazova | China Railway International Co. Ltd. Serbia, Belgrade Branch / Kruševac Put a.d. Kruševac |
| 6 | Application of the OVM post-tensioning system and post-tensioning works on Bridge No. 16 at km 590+981, E70 / E75 motorway – Belgrade Bypass, section: Dobanovci – Bubanj Potok | Power Construction Corporation of China Limited, Belgrade Branch / Diorit d.o.o. Belgrade |
| 7 | Investigation services on supporting steel and concrete structures of the main power building (GPO) – Boiler supporting steel structure at Block A2 | China Railway International Co. Ltd. Serbia, Belgrade Branch / Diorit d.o.o. Belgrade |
| 8 | Load capacity testing of geotechnical anchors on the retaining wall of the exit and entry portals of the Beli Potok Tunnel on the Belgrade Bypass | Power Construction Corporation of China Limited, Belgrade Branch / Ferbild d.o.o. Belgrade |
| 9 | Load capacity testing of geotechnical anchors within the foundation pit shoring structure for the construction of the new walking beam furnace at the HBIS Steelworks Smederevo | PIN Konsalting Centar d.o.o. Belgrade |